Implementing an Effective Crisis Management Plan Within the Rail Industry

Download Download Now
(you must be registered)

  • Date:
    06-10-2006
  • Vendor:
  • Registration:
    Required
  • Type:
    Case Studies
  • File size:
    Not specified
  • Format:
  • Pages:
    Not specified

Publisher’s description

Londonlines was set up in 2001 as the headquarters of National Express Group's London train operations - Wagn, c2c and Silverlink. Before joining Londonlines as Operations Director, Richard Morris worked at the Strategic Rail Authority (SRA) where he was influential in improving crisis management across the rail industry. Morris knew that a review of crisis management across the rail industry would be a major project and he would need help. Morris started the project by organising a working group comprising representatives from all of the organisations that would need to be involved. Insight then embarked on a series of interviews with senior managers from each of these organisations.
Advertisement

Upload Upload your whitepaper now

Latest Videos

Sponsored content

Power Centre - Content from our premier sponsors

Blogs

  • Suzanne Tindal IT: Govt's cost-cutting bitch
    The government needs to stop looking at IT as a necessary evil or the place to remove costs when the Treasurer comes calling.
  • Array Can complaints on mobile content be cut?
    On 1 July this year the new Mobile Premium Services Code was introduced. It sounds like it's had a good impact, but is it enough?
  • Array NZ farmers: Bleating about broadband
    As we know, farmers are such bleaters. They bleat as much as the four-legged woolly things in their paddocks. If it's not the weather, it's the strength of the dollar! Nothing is ever right. Likewise with rural broadband.
  • More blogs »

Tags

Back to top

Featured