Power trip: Four high-end notebooks tested

By
28 February 2003 03:40 PM
Tags: high end, acer, thinkpad, toshiba, ibm, lifebook, fujitsu, power

Specifications

Notebook Toshiba Satellite 5200 IBM Thinkpad T30 2366 97M Acer Travelmate 426LC Fujitsu Lifebook E7010
Processor Pentium 4-M Pentium 4-M Pentium 4 Pentium 4-M
Processor speed 2.2Ghz 2Ghz 2.4Ghz 2.2Ghz
Amt of RAM 512MB 256MB 256MB 512MB
Hard drive 60GB 60Gb 30GB 60GB
Optical drive DVD-R/RW/DVD-RAM/CD-RW DVD/CD-RW Combo 8X DVD + 24/16/10 CD-RW drive Combo CD-RW/DVD-ROM
Graphics hardware nVidia GeForce 4 460 Go 64MB ATI Mobility Radeon 7500 16MB ATi Radeon 7500 32 MB ATI Mobility RADEON 7500 32MB
Diagonal screen size 15 inches 14.1inches 15 inches 14 Inches
Natural resolution (max) 1600x1200 1400x1050 1024x768 1400x1050
Modem included? International V.90 Modem Agere Systems AC '97 Modem Conexant SoftK56 Data Fax Modem V.90 modem
Network interface Integrated 10/100 Ethernet, Integrated Bluetooth Integrated 10/100 Integrated 10/100 Integrated 10/100
Operating system Windows XP Professional Windows XP Professional Windows XP Professional Windows XP Professional
Weight w/battery 3.6kg 2.6kg 2.9kg 2.4kg
Claimed Battery life 3 hours 2.5hrs Up to 2.5 hours 2.7 hours
Base warranty 1 year parts and labour domestic and international warranty 3 years/1 year battery 1 Year 1 Year
RRP AU$6499 AU$5099 AU$3,999 AU$6999


Power trip:
Four high-end
notebooks tested

Introduction
1. Acer Travelmate 426LC
2. Fujitsu Lifebook E7010
3. IBM Thinkpad T30
4. Toshiba Satellite 5200
Benchmark results
Specifications
< Prev 1 2 3 4 5 6 7
Advertisement

Talkback 0 comments

Reviews by category

Latest Videos

Sponsored content

Power Centre - Content from our premier sponsors

Blogs

  • David Braue Welcome to National Censorship Day
    Conroy's blind adherence to his net filtering plan will abandon Net neutrality ideals and push ISPs down a slippery slope of unprecedented responsibility for a callously politicised Australian Internet.
  • Array That sinking Tcard feeling
    There's something terribly unsettling about realising that the NSW Government is considering hiring a company to build a new electronic ticketing system which has already put it through the legal wringer for the system's predecessor.
  • Array The challenge of government 2.0
    The Government 2.0 Taskforce released its draft report last week, and its recommendations for Open Government almost reads like a manifesto. Stilgherrian's guest on Patch Monday this week is the chair of the Taskforce, Nicholas Gruen.
  • More blogs »

Tags

Back to top

Featured